ODT-1.2 · Domain 1
Collective irrigation infrastructure
Production limited to the rainy season, conflicts over water use, irrigation schemes abandoned for lack of management.
How to read this sheet
The territorial problem addressed, what ODT delivers itself, the deliverables, the support of the other divisions, the SDG targets and the proposed monitoring indicators.
- Context figures are sourced and dated.
- Final indicators are agreed with the contracting authority.
- Track-record status is shown until references are documented.
The context in Cameroon
Rural production is held back first by isolation and by the lack of reliable water and energy. This infrastructure is beyond the means of an individual producer: it requires collective planning led by municipalities and farmer organisations. See all the challenges →
What ODT delivers
- Assessment of water resources and water-use rights at catchment level
- Design of shared structures: intake, main canals, control structures
- Organisation of the water users' association and water-sharing rules
- Financing plan for the scheme and its maintenance
Deliverables
- Water resources and demand balance
- Outline and detailed design of the scheme (APS / APD)
- Statutes and rules of the water users' association
- Financing plan
With the other XP-NOVA divisions
ODT remains your single point of contact: it coordinates the support and brings the results together in one file.
Contribution to the SDGs
| SDGs | Target |
|---|---|
2Zero hunger | 2.4 · Sustainable and resilient food production systems |
6Clean water and sanitation | 6.4 · Increase water-use efficiency |
9Industry, innovation and infrastructure | 9.1 · Reliable, sustainable and resilient infrastructure |
13Climate action | 13.1 · Resilience and adaptive capacity to climate-related hazards |
Targets are abridged; the official wording is published by the United Nations.
Proposed monitoring indicators
- Irrigated area farmed in the dry season (ha)
- Volume of water abstracted per irrigated hectare
- Fee recovery rate of the water users' association
Final indicators, baselines and targets are agreed with the contracting authority in the project's results framework.
Let's talk about your territory
Describe your territory and your ambition: a first response within 48 working hours.
