ODT-1.1 · Domain 1

Rural feeder roads

Isolated production areas: post-harvest losses, low farm-gate prices, inputs delivered late or not at all.

How to read this sheet

The territorial problem addressed, what ODT delivers itself, the deliverables, the support of the other divisions, the SDG targets and the proposed monitoring indicators.

  • Context figures are sourced and dated.
  • Final indicators are agreed with the contracting authority.
  • Track-record status is shown until references are documented.
Shared production infrastructure
Illustrative drawing.

The context in Cameroon

8.4%of the road network is paved: 10,226 km out of 121,873 km. Most of the municipal network is unpaved.Ministry of Public Works (MINTP), interview with the Minister in Cameroon Tribune · data as at 31/12/2023 · source ↗
28.4%of rural households have access to electricity, compared with 87.6% in urban areas.INS, Fifth Cameroon Household Survey (ECAM5) · published 30/04/2024 · source ↗

Rural production is held back first by isolation and by the lack of reliable water and energy. This infrastructure is beyond the means of an individual producer: it requires collective planning led by municipalities and farmer organisations. See all the challenges →

What ODT delivers

  • Analysis of production flows and ranking of road sections to open up
  • Route selection, topographic surveys and design of the road and crossing structures (box culverts, fords)
  • Works tender documents, supervision and acceptance
  • Maintenance arrangements: road committee, road maintenance workers, municipal budget

Deliverables

  • Road section prioritisation note
  • Preliminary and detailed design
  • Works tender documents
  • Maintenance plan and management agreement

With the other XP-NOVA divisions

This service is delivered entirely by ODT.

ODT remains your single point of contact: it coordinates the support and brings the results together in one file.

Contribution to the SDGs

SDGsTarget
2Zero hunger
2.3 · Double the agricultural productivity and incomes of small-scale food producers
8Decent work and economic growth
8.3 · Productive activities, decent jobs and entrepreneurship
9Industry, innovation and infrastructure
9.1 · Reliable, sustainable and resilient infrastructure
11Sustainable cities and communities
11.a · Economic links between urban, peri-urban and rural areas

Targets are abridged; the official wording is published by the United Nations.

Proposed monitoring indicators

  • Share of the area's population living within 2 km of an all-season road (reference: SDG indicator 9.1.1)
  • Kilometres of roads passable all year round
  • Transport cost per tonne

Final indicators, baselines and targets are agreed with the contracting authority in the project's results framework.

Let's talk about your territory

Describe your territory and your ambition: a first response within 48 working hours.

WhatsApp