Unblocking a funded project that is not moving
“The money is there, the agreements are signed, and still nothing is being built.”
What is happening
Your situation
Your project is funded. The special account is open. And the disbursement rate stays low, portfolio review after portfolio review. The causes are neither funding nor willingness: procurement procedures are bogging down, land tenure has not been cleared, resettlement was not prepared, and the coordination team lacks the technical means to appraise what it has to appraise.
What you risk
- As at 30 June 2026, the 21 World Bank-funded projects in Cameroon showed an overall disbursement rate of 18.7% — 20.3% for national projects, 17.2% for regional ones.
- The causes identified are explicit: administrative delays, public procurement procedures, land tenure constraints, resettlement of affected people, and limited contracting capacity within coordination units.
- Disbursement that falls behind means cancelled balances, extensions to negotiate, and credibility damaged for the next cycle.
Who is concerned
Our answer
What we do
We start with a bottleneck diagnosis, line by line: where the file stops, who is waiting for what, which document is missing. We then produce the technical documents that unblock — terms of reference, bidding documents, particular technical specifications, evaluation grids — and we support bid evaluation. In parallel, we deal with the two causes nobody wants to open: land tenure and resettlement, with a geospatial component that establishes site boundaries and identifies affected people.
In the Central African context
What you receive
Deliverables
Things delivered, not intentions.
- Bottleneck diagnosis and accelerated disbursement plan, line by line
- Terms of reference, bidding documents and technical specifications
- Evaluation grids and support to bid analysis
- Geospatial component of impact assessments and georeferenced resettlement action plans
- Procurement and disbursement dashboard
Services involved
ODT structures and operates territorial programmes. XP-NOVA delivers the engineering.
Sources
- World Bank portfolio review in Cameroon as at 30/06/2026 — secondary press source — to be confirmed with MINEPAT
- Public procurement procedures manual — ARMP Cameroon — May 2023
Recommended first step: A bottleneck diagnosis line by line, sized to stay below your purchase-letter threshold.
Let's talk about your territory
Describe your territory and your ambition: a first response within 48 working hours.