XP-NOVA

RES-701 — Endure

Sustainability plan for an asset or a programme

A plan that organises the operation, maintenance and follow-up of what has been built, before the works are handed over.

RES-701Stage 6Added in 10/2026
« What will hold once the project is delivered, and against shocks (climate, health, prices, political cycles)? »

A plan that organises the operation, maintenance and follow-up of what has been built, before the works are handed over.

The deliverable of the fifth stage of the method: the sustainability plan brings together the operation and maintenance plan, the designated manager, the annual maintenance provision, operator training and the climate and health watch in the observatory. It applies the five rules of the living facility: demand before concrete, manager before opening, revenue before subsidy, ring-fenced maintenance, follow-up through data.

Deliverables

  • Sustainability plan for the asset or programme
  • Operation and maintenance plan
  • Designation of the manager
  • Annual maintenance provision
  • Operator training plan
  • Sustainability follow-up schedule

Resources deployed

  • Operations and maintenance engineer
  • Project economist
  • Climate risk specialist
  • Operating model
  • Territorial observatory

Engineering delivered by XP-NOVA — Consulting Engineering Firm. Delivery and remuneration terms are set out in the proposal, after your situation has been qualified.

Let's talk about your territory

Describe your territory and your ambition: a first response within 48 working hours.