XP-NOVA

REA-305 — Build

Full design supervision and site management

Full management of the operation — design, site direction and technical clearance per milestone — so payment follows actual execution rather than the contractor's declaration.

REA-305Stage 3Added in September 2026
« How do we make sure the works built match the drawings, and that what is invoiced was actually done? »

Full management of the operation — design, site direction and technical clearance per milestone — so payment follows actual execution rather than the contractor's declaration.

Design supervision covering execution studies, site management, adversarial verification of quantities and handover of the works, with a technical clearance issued at every contractual milestone.

Deliverables

  • Approved execution documents and orders to proceed
  • Weekly reports and non-conformity register
  • Technical clearance per milestone, enforceable against the interim payment
  • Interim measurements and adversarial verification of quantities
  • Handover records and as-built drawings

Resources deployed

  • Project director
  • Principal rural or urban engineering specialist
  • Site inspector
  • RTK survey instruments
  • Mobile control tools
  • OHADA-law escrow account

Engineering delivered by XP-NOVA — Consulting Engineering Firm. Delivery and remuneration terms are set out in the proposal, after your situation has been qualified.

Attached to

The situations that call on this service

That is the way in if you are looking for an answer rather than a reference.

Let's talk about your territory

Describe your territory and your ambition: a first response within 48 working hours.