ODT-5.4 · Domain 5

Erosion-control infrastructure

Gullying of cultivated slopes and silting of lowlands.

How to read this sheet

The territorial problem addressed, what ODT delivers itself, the deliverables, the support of the other divisions, the SDG targets and the proposed monitoring indicators.

  • Context figures are sourced and dated.
  • Final indicators are agreed with the contracting authority.
  • Track-record status is shown until references are documented.
Environmental and resilience infrastructure
Illustrative drawing.

The context in Cameroon

2 millionpeople live in drought-prone areas; the northern regions are the most vulnerable.World Bank, Country Climate and Development Report (CCDR) Cameroon · November 2022 · source ↗
Over 70%of the population depends directly on agriculture for its livelihood.World Bank, Country Climate and Development Report (CCDR) Cameroon · November 2022 · source ↗

Climate hazards hit a population that relies heavily on agriculture. Protecting soils, water and infrastructure is a condition for the territory's economic survival, particularly in the northern regions. See all the challenges →

What ODT delivers

  • Erosion assessment at catchment level
  • Design of works (stone lines, terraces, small bunds, check dams)
  • Community mobilisation and organisation of works
  • Supervision and monitoring of effectiveness

Deliverables

  • Erosion assessment
  • Development plan
  • Works organisation
  • Monitoring report

With the other XP-NOVA divisions

AGROVITA ↗Conservation farming practices

ODT remains your single point of contact: it coordinates the support and brings the results together in one file.

Contribution to the SDGs

SDGsTarget
2Zero hunger
2.4 · Sustainable and resilient food production systems
13Climate action
13.1 · Resilience and adaptive capacity to climate-related hazards
15Life on land
15.3 · Restore degraded land and soil

Targets are abridged; the official wording is published by the United Nations.

Proposed monitoring indicators

  • Area treated (ha)
  • Gullies stabilised
  • Change in yields

Final indicators, baselines and targets are agreed with the contracting authority in the project's results framework.

Let's talk about your territory

Describe your territory and your ambition: a first response within 48 working hours.

WhatsApp