ODT-5.2 · Domain 5
Stormwater management
Flooding of villages, subdivision headquarters and periodic markets; roads cut off; gullied structures.
How to read this sheet
The territorial problem addressed, what ODT delivers itself, the deliverables, the support of the other divisions, the SDG targets and the proposed monitoring indicators.
- Context figures are sourced and dated.
- Final indicators are agreed with the contracting authority.
- Track-record status is shown until references are documented.
The context in Cameroon
Climate hazards hit a population that relies heavily on agriculture. Protecting soils, water and infrastructure is a condition for the territory's economic survival, particularly in the northern regions. See all the challenges →
What ODT delivers
- Hydrological study of the catchment
- Stormwater drainage master plan
- Design of collector drains, ditches and attenuation basins
- Tender documents, works supervision and maintenance plan
Deliverables
- Hydrological study
- Master plan
- Detailed design
- Maintenance plan
With the other XP-NOVA divisions
This service is delivered entirely by ODT.
ODT remains your single point of contact: it coordinates the support and brings the results together in one file.
Contribution to the SDGs
| SDGs | Target |
|---|---|
6Clean water and sanitation | 6.5 · Integrated water resources management |
11Sustainable cities and communities | 11.5 · Reduce losses caused by disasters, including floods |
13Climate action | 13.1 · Resilience and adaptive capacity to climate-related hazards |
Targets are abridged; the official wording is published by the United Nations.
Proposed monitoring indicators
- Length of drainage built
- Flood events and damage recorded
- Structures maintained before the rainy season
Final indicators, baselines and targets are agreed with the contracting authority in the project's results framework.
Let's talk about your territory
Describe your territory and your ambition: a first response within 48 working hours.
