ODT-3.2 · Domain 3

Rural logistics hubs

No consolidation: each producer hires transport alone, at a loss.

How to read this sheet

The territorial problem addressed, what ODT delivers itself, the deliverables, the support of the other divisions, the SDG targets and the proposed monitoring indicators.

  • Context figures are sourced and dated.
  • Final indicators are agreed with the contracting authority.
  • Track-record status is shown until references are documented.
Logistics and transport infrastructure
Illustrative drawing.

The context in Cameroon

8.4%of the road network is paved: 10,226 km out of 121,873 km. Most of the municipal network is unpaved.Ministry of Public Works (MINTP), interview with the Minister in Cameroon Tribune · data as at 31/12/2023 · source ↗
17.7%of the maize harvest is lost after harvest, about 261,000 tonnes.APHLIS, cereal post-harvest losses, Cameroon · 2021 estimates · source ↗

With a network that is overwhelmingly unpaved, the rainy season cuts production areas off from their markets. The task is to organise flows at territorial level: priority roads, consolidation, cold storage. See all the challenges →

What ODT delivers

  • Hub site selection based on flows and access
  • Design of loading bays, yards and buildings
  • Operating and consolidation model
  • Financing and operator contracts

Deliverables

  • Location study
  • Hub plans
  • Operating model
  • Financing plan

With the other XP-NOVA divisions

Technologie ↗Handling equipment and internal logistics

ODT remains your single point of contact: it coordinates the support and brings the results together in one file.

Contribution to the SDGs

SDGsTarget
8Decent work and economic growth
8.3 · Productive activities, decent jobs and entrepreneurship
9Industry, innovation and infrastructure
9.1 · Reliable, sustainable and resilient infrastructure
12Responsible consumption and production
12.3 · Reduce food losses, including post-harvest losses

Targets are abridged; the official wording is published by the United Nations.

Proposed monitoring indicators

  • Volumes consolidated (t/year)
  • Logistics cost per tonne
  • Producers served

Final indicators, baselines and targets are agreed with the contracting authority in the project's results framework.

Let's talk about your territory

Describe your territory and your ambition: a first response within 48 working hours.

WhatsApp