New Ouagadougou-Donsin airport
Burkina FasoTechnical design supervision (technology packages)
Complete aerodrome: 80 buildings (120,000 m²), utilities, runways — 34 MW installed electrical capacity. Full design of power, low-current, HVAC and plumbing systems.
- Period
- 2012–2013 (12 months)
- Services
- FCFA 99m excl. tax
- Team
- 14 experts
Client: EGIS Cameroon
Rehabilitation of the Yaoundé Omnisport stadium
CameroonTechnical design supervision and works control
30,000-seat stadium (CAF/FIFA compliance) and R+2 annex buildings. Full design of power, low-current, HVAC, plumbing, sound, lighting and safety systems.
- Period
- 2015–2016 (15 months)
- Services
- FCFA 160m incl. tax
- Team
- 22 experts
Client: EGIS Cameroon
Olembé Olympic sports complex (COSO)
CameroonWorks control — drawings approval (power, low-current, plumbing, HVAC)
60,000-seat complex: main stadium, training pitches, gymnasium, Olympic pools, 5* hotel — turnkey construction (PICCINI).
- Period
- 2017–…
- Services
- FCFA 8m incl. tax
- Team
- 5 experts
Client: EGIS Cameroon (EGIS International, delivery supervision)
École Normale Supérieure, Maroua
CameroonTechnical design supervision (buildings and utilities)
University campus of 25 buildings on 63 ha: full design of power, low-current, HVAC and plumbing systems for buildings and utilities.
- Period
- 2008–2011 (12 months of services)
- Services
- FCFA 79m excl. tax
- Team
- 8 experts
Client: EGIS Cameroon
CSPH headquarters building
CameroonTechnical design supervision and works control
R+6 building: full design of the technical systems (power, low-current, HVAC, plumbing, sound, lighting, safety).
- Period
- 2001–2007 (36 months)
- Services
- FCFA 72m incl. tax
- Team
- 8 experts
Client: EGIS Cameroon
SNI high-rise rehabilitation (R+18)
CameroonTechnical design supervision and works control
R+18 high-rise: complete technical systems, lifts, generator sets.
- Period
- 2002–2003 (15 months)
- Services
- FCFA 75m incl. tax
- Team
- 10 experts
Client: EGIS Cameroon
CAA headquarters — design
CameroonTechnical design supervision
R+8 building with 3 basement levels: full design of the technology packages.
- Period
- 2009–2010 (6 months)
- Services
- FCFA 35m incl. tax
- Team
- 8 experts
Client: EGIS Cameroon
CAA headquarters — works control
CameroonWorks control (power, low-current, plumbing, HVAC) — factory acceptance of equipment in Spain
R+8 building with 3 basement levels.
- Period
- 2013–2016 (16 months of services)
- Services
- FCFA 32m incl. tax
- Team
- 5 experts
Client: EGIS Cameroon
Total E&P headquarters — Brazzaville
CongoTechnical design supervision (detailed design phase)
R+7 building with 2 basements: full design of the technical systems.
- Period
- 2017 (6 months)
- Services
- FCFA 34m incl. tax
- Team
- 9 experts
Client: EGIS Cameroon